Was at the company at 1100 hrs today, so i could get the cab done.
Started to cut 2 pieces of MDF..:

Found the drawing and begun to draw the side of the cab..

For the curved corners i used a ...Passer, the Danish for it, don´t know the english word...

Cut of the top with a circular saw

And woila! one side finished...

Placed the finished side at the bottom and took the last piece of MDF and placed it on top, and used a router for the cut:

From the bottom

Yes, two finished sides.

Routed the trench for the T-Mold

Made some lists for the cab assembly

Assembling, under the lists i used glue for better support, and nailed the whole shabang together from the inside

Finished routing the speaker holes..

Final assembling

Mounting Bezel supporting lists

And, finally, finished

And with Marquee and Bezel

Tomorrow i will paint the inside black, and the room behind the marquee white...