5.6 on a place where you need 5 is good i would say
but 0.11 where you need 12 sounds to me like you found your problem

about the wire, hard to tell where it supposed to go, but a good thing is to check all the parts that need ground (wich is all parts

) are connected to ground.
a simple way of doing that is the continuetest on your meter (diodetest).
put one test lead on a metal part (does not matter what, they should all be grounded) and point the other testlead to all parts ground connector.
if you hear a beep, then there is contact with ground, and that should be ok then.